Category 4. Institution-Wide Evaluations and Audits (+ Research)
Section 4.A. Evaluations
Indicator 4.A.i. Draft evaluations
4.A.i. Draft evaluations
| Indicator |
A general account of the findings of an evaluation prior to its finalization. |
| Recommended Standard |
In order to ensure that the evaluations unit has accurately characterized stakeholder comments and that the final evaluations do not include factual errors, draft evaluations should be disclosed. |
2013
This document may be disclosed for public review and comment.
2023
There is no mention of the disclosure of draft evaluations in the Operations Evaluations Department (OPEV) documents, or in the Disclosure Policy.
2042
"The Evaluation Department (EvD) provides
independent evaluations of the implementation of projects undertaken by the Bank and its
sectoral and operational strategies, with sole
accountability to the Board of Directors."
2053
"Operations Evaluation (EV) carries out ex-post evaluations of the EIB Group's operations. The objective is to assess operations with a view to identifying aspects that could improve operational performance, accountability and transparency. EV Focuses on how the institution (EIB – EIF) conducts its operations, given the framework of relevant EU policies (the Treaty, Directives, Council Decision, mandates etc..) and the decisions of the EIB Governors." The Public Disclosure Policy does not indicate that a draft evaluation is disclosed, however it states, "Operations Evaluation activities are carried out within the Inspector General’s
Department by a separate Operations Evaluation team, independent from the operational
directorates. This team prepares ex-post thematic, sector and regional/country
evaluations of EIB’s financing operations, which are published on the Website after
discussion by the Board of Directors. An annual “Operations Evaluation Overview Report”
is also published."
2062
2063
This document is submitted by the country concerned or by the Bank's management regarding specific evaluations documents.
2116
The IFC does not disclose draft evaluations reports.
| Reference | IFC Operations and Evaluations Group webpage (http://www.ifc.org/oeg/) |
| Sector | Private |
| Last Updated | |
| Status Updated | 2/7/2005 |
2087
No information is available on IIC Evaluations at the IDB’s Office of Evaluations.
2148
| Sector | Public |
| Last Updated | |
| Status Updated | 2/7/2005 |
2149
It is prepared for each study, identifying the questions to be addressed and also, to the extent practicable, the methodology. This document is disclosed on a case-by-case basis.
2139
MIGA’s independent Operations Evaluation Unit (OEU), first granted funds in 2002, does not disclose any information anywhere on the web.
| Sector | Private |
| Last Updated | |
| Status Updated | 2/7/2005 |
2096
The WB does not have requirements to release draft evaluations.
| Sector | Public |
| Last Updated | |
| Status Updated | 2/7/2005 |